Figure 1: From architectural claim to bounded evidence
Description
A design claim is translated into a testable question, controlled evidence, an explicit limitation and a next decision or experiment. The cycle does not equate reference results with production readiness.
Purpose
Show how an MVP should connect a claim to a test and preserve the limitations of the evidence.
Specification
A cycle from design claim, to testable question, to controlled evidence, to explicit limitation, to next decision or experiment. Do not show invented metrics or imply that every test demonstrates readiness.
Read in context
What a Reference MVP Can Prove, and What It Cannot
A useful prototype should make the limits of its evidence obvious.